Bathroom Renovation Timeline: How Long Does A Bathroom Reno Take In Albury?

McGrath Builders & Associates • January 12, 2026

A bathroom renovation in Albury is one of the most rewarding upgrades you can make to your home, but it is also one of the most complex. Unlike a cosmetic refresh, a full renovation involves multiple trades, precise sequencing and materials that must arrive at the right time. For many homeowners, the biggest concern is not just the end result, but how long the process will take and how disruptive it will be along the way.


Understanding the typical bathroom renovation timeline helps set realistic expectations and removes a lot of unnecessary stress. From early planning and design decisions through to final handover, each stage plays an important role in keeping the project running smoothly. With the right preparation and experienced project management, bathroom renovations can progress efficiently without compromising quality.


This guide walks through the key stages of a bathroom renovation, explains how long each step usually takes, highlights common causes of delays and outlines practical ways to keep your renovation on track.

Fully Furnished Bathroom After Renovations

Planning & Design

The planning and design stage lays the foundation for the entire renovation. Rushing this phase can lead to delays later, so taking the time to finalise layouts, fixtures and finishes upfront is essential.


This stage typically takes one to three weeks, depending on how quickly decisions are made and whether custom elements are involved. It is where functionality, style and budget all come together.


Key components of this stage include:


  • Assessing the existing bathroom layout & identifying any structural or plumbing limitations
  • Selecting fixtures, fittings, tiles & finishes
  • Finalising design drawings & scope of works
  • Confirming budgets & timelines


Clear planning reduces the risk of mid-project changes, which are one of the most common causes of extended renovation timelines.

Approvals & Pre-construction Preparation

Before any physical work begins, approvals and logistical planning must be completed. This step ensures the renovation complies with relevant building requirements and that all trades are booked in the correct order.


This stage generally takes one to two weeks. While it may not feel like progress is happening, it is a critical part of avoiding delays once construction starts.


Typical tasks include:


  • Organising any required building approvals or compliance documentation
  • Confirming final measurements & specifications
  • Ordering fixtures, tiles & materials with confirmed lead times
  • Locking in trade schedules


Having materials ordered early is particularly important, as product availability can significantly impact the overall timeline.

Demolition & Strip-out

Demolition marks the first visible stage of the renovation and is often one of the quickest phases. The existing bathroom is carefully stripped back to prepare the space for new work.


This stage usually takes two to four days, depending on the size of the bathroom and whether walls, floors or fixtures need to be removed.


Work completed during this phase includes:


  • Removal of existing fixtures & fittings
  • Strip-out of wall linings & floor coverings
  • Safe disposal of demolition materials
  • Initial inspection of plumbing & framing


Once demolition is complete, any hidden issues such as water damage or outdated plumbing can be properly assessed.

Rough-in Plumbing & Electrical Work

With the bathroom stripped back, trades can begin rough-in work. This involves installing new plumbing and electrical services before walls are closed up.


This stage generally takes three to five days, depending on the complexity of the layout and whether fixtures are being relocated.


Key tasks include:


  • Repositioning water & waste pipes
  • Installing electrical wiring for lighting, power points & exhaust fans
  • Preparing services for vanities, showers & toilets
  • Ensuring compliance with current standards


Accurate rough-in work is essential, as mistakes at this stage can cause costly delays later.

Waterproofing & Wall Preparation

Waterproofing is one of the most critical stages in any bathroom renovation. It protects the structure of the home and ensures long-term durability.


This stage typically takes two to three days, including curing time. Rushing waterproofing can compromise the entire renovation, so drying times must be respected.


This phase includes:


  • Applying waterproof membranes to floors & wet areas
  • Sealing junctions & penetrations
  • Installing wall linings such as cement sheeting
  • Allowing membranes to cure fully before tiling


Proper waterproofing is not just about compliance, it is about preventing future damage and costly repairs.

Tiling & Flooring Installation

Tiling is where the bathroom really starts to take shape visually. This stage often takes longer than expected due to the precision required and the need for adhesive and grout to cure properly.


On average, tiling takes five to seven days, depending on tile size, layout complexity and drying times.


Work during this stage includes:


  • Laying floor tiles & wall tiles
  • Creating falls to floor wastes
  • Grouting & sealing tiles
  • Allowing adequate curing time


Complex patterns or feature tiles can extend this phase, but careful workmanship ensures a high-quality finish.

Fit-off & Fixture Installation

Once tiling is complete, the bathroom moves into the fit-off stage. This is where fixtures and fittings are installed and the space begins to function as a bathroom again.


This stage typically takes three to five days.


Tasks include:


  • Installing vanities, toilets & basins
  • Fitting showers, screens & baths
  • Connecting taps, lighting & electrical fixtures
  • Installing mirrors, towel rails & accessories



Fit-off requires close coordination between trades to ensure everything aligns with the original design and functions correctly.

Final Inspections & Handover

The final stage focuses on quality checks, compliance and presentation. Any minor adjustments are completed before the bathroom is handed back to the homeowner.


This stage usually takes one to two days.


Final steps include:


  • Testing plumbing & electrical systems
  • Final cleaning & detailing
  • Addressing any defects or adjustments
  • Conducting the final walkthrough


At this point, the renovation is complete and ready for everyday use.

What Can Delay a Bathroom Renovation?

Even with careful planning, delays can occur. Being aware of common causes helps homeowners understand where timelines can shift.


Typical delay factors include:


  • Product lead times or back-ordered fixtures
  • Changes to design after construction begins
  • Unexpected structural or plumbing issues
  • Trade availability or weather-related disruptions


Working with an organised builder who plans ahead significantly reduces the impact of these issues.

How to Keep Your Renovation on Schedule

There are practical steps homeowners can take to help keep a bathroom renovation moving smoothly from start to finish.


Helpful strategies include:


  • Making design & product selections early
  • Avoiding mid-project changes where possible
  • Maintaining clear communication throughout the build
  • Trusting the construction sequence & curing times


A well-managed project balances efficiency with quality, ensuring the finished bathroom performs as well as it looks.

Get in Touch

At McGrath Builders & Associates, we understand that bathroom renovations require careful coordination, clear communication and realistic timelines, especially when managing local trade schedules and product availability in the Albury region. If you are planning bathroom renovations Albury homeowners can feel confident in, our team is here to guide you through every stage with clarity and care. Get in touch and start planning a renovation that runs smoothly from the first decision to final handover.

Bathroom After Renovation
By McGrath Builders & Associates December 16, 2025
Avoid costly mistakes with bathroom renovations in Albury by planning properly and choosing the right materials. Read more today.
Bathroom With Dark Cabinets, Large Mirror, and Tiled Walls. a Towel Hangs Near the Sink
By Mcgrath Builders & Associates November 20, 2025
Get expert insights into bathroom renovations in Albury — trends, realistic costs and local tips to help you plan your dream space smartly.